Workorder
Date: 03-10-2026
Address: 4814 Tower C
Greensboro, NC 27410
Manager: Pink Team
Status: 0 of 8 completed
Link:
Notes
Active Tasks - 8
Patch damaged drywall and apply 1 coat of primer and 1 coat of paint
Remove and reinstall shower door
Demo first row of wall tile, base tile, and shower pan
Replace damaged subfloor
Install pre-sloped Schluter shower pan and drain assembly
Repair tile substrate on walls and apply Kerdi Band and other waterproofing methods
Install new tile on base, walls, and curb
Additional fees to remove construction debris, cover tenants personal items, and cover flooring during construction
Completed Tasks - 0
No Completed Tasks
Photos
No photos currently