Workorder
Date: 02-13-2026
Address: 150 James Rd 3D
High Point, NC 27265
Manager: Blue Team
Status: 0 of 10 completed
Link:
Notes
Active Tasks - 10
Repaint all walls and touch up ceiling and trim
Heavy cleaning required. Kitchen will require extra attention
Cut out and troubleshoot large stain on living room ceiling. Patch and texture once leak is repaired
Replace bulbs in hallway 2x and install 8x vanity bulbs in bathrooms
Reinstall tub stopper in hall bath
Remove debris from hall bath sink drain
Remove debris from garbage disposal
Fridge requires door shelf, a crisper cover, a main shelf, an auxiliary shelf, and a led replacement
Attempt to close gap on kitchen floor
Install transition strip at laundry door
Completed Tasks - 0
No Completed Tasks